







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterHow Much Does Tub-to-Shower Conversion Cost in Hayward?
Tub-to-shower conversion in Hayward typically runs $3,500 to $10,000 for a full conversion, with most standard alcove projects landing between $5,200 and $7,800. A basic acrylic-and-surround swap sits at the low end ($3,500 – $4,800), while a tiled custom walk-in with a linear drain, frameless glass, and upgraded fixture package pushes toward the top ($8,000 – $10,000). That number covers demo of the old tub, new waterproofing and substrate, the shower pan, tile or surround, glass, valve trim, and final inspection-ready finish work.
Hayward’s aging housing stock matters here. Much of the city was built between 1945 and 1985, and a lot of that stock has the 60-inch cast-iron tub alcove set into a framed platform with original galvanized supply lines behind the wall. That combination is the single biggest swing factor in whether a conversion lands near $4,000 or near $9,000 – and it’s why we measure the substrate and look behind the wall before we put a firm number in writing.
Key takeaways:
- Most Hayward tub-to-shower conversions cost $5,200 – $7,800; the full market range is $3,500 – $10,000.
- Cast-iron tub removal, hidden water damage, and valve replacement are the three biggest cost drivers.
- A standard conversion takes 3 – 5 working days; a custom tiled shower with glass takes 6 – 10.
- Written price before any work starts – no surprise change orders without your signature.
- Free estimates and a free second opinion on any competitor’s written quote.
If you want the exact number for your bathroom rather than a range, that’s what we do before a single tool goes in the truck. More on the surrounding process lives on our home page.

Tub-to-Shower Conversion Cost Breakdown (2026)
Here’s how the $3,500 – $10,000 lead range breaks down in the Hayward market as of 2026. These are line-item ranges, not a single bundled guess:
| Line item | Typical range | What it covers |
|---|---|---|
| Demo and tub removal | $350 – $900 | Cast-iron tubs sit at the top; acrylic tubs at the low end. Includes haul-away and disposal fees. |
| Waterproofing and substrate | $600 – $1,600 | Cement board, membrane, and pan liner or a bonded sheet membrane system. |
| Shower pan and drain | $500 – $1,400 | Pre-formed pan or a poured mud pan. Linear drains run higher than center drains. |
| Tile or acrylic surround | $900 – $3,200 | Acrylic and fiberglass surrounds at the low end; porcelain, ceramic, or stone tile at the top. |
| Shower valve and trim | $450 – $1,100 | Pressure-balance valve, thermostatic valve, and finish trim. Kohler and Toto are common picks here. |
| Glass enclosure | $500 – $1,800 | Framed slider at the low end; frameless 3/8-inch glass and a hinged door at the top. |
| Permit and inspection | $150 – $450 | Most conversions require a plumbing permit; verify current City of Hayward fees at pull time. |
| Labor (rough and finish) | $1,200 – $2,800 | Demo, framing adjustments, plumbing rough-in, tile setting, and finish carpentry. |
Add it up and you land inside $3,500 – $10,000 almost every time. The line items that move most are demo (cast iron really does cost more), substrate repair (Hayward’s older moisture issues show up here), and glass. A frameless glass door versus a framed slider is a $700 – $1,000 swing on its own. If you want to see how this compares to a broader project, our Hayward service area page covers the full bathroom remodel range ($9,000 – $28,000) and when a conversion is a smaller, smarter move inside that larger scope.
What Affects Tub-to-Shower Conversion Pricing in Hayward
Two conversions on the same street in Hayward can differ by $3,000 because of what’s under the tile and behind the wall. Here’s what actually drives the number:
- Hidden water damage behind the tub. Hayward’s older bathrooms, particularly in neighborhoods built in the 1950s and 1960s, often have a rotted subfloor or green board that’s been quietly failing behind the tub. Once the tub comes out, the true condition shows. Repairing a soft subfloor or a rotted stud can add $400 – $1,200 to the job. We photograph what we find before we quote the repair.
- Tub material and access. A cast-iron tub weighs 300 – 400 pounds and often has to be cut on site to get it out of the room. That’s a labor line item, not a free service. Acrylic tubs are lighter and remove faster.
- Plumbing age and valve condition. Many Hayward homes still have galvanized supply lines and original two-handle valves. If the valve body is seized or the wall cavity has active corrosion, the rough-in has to be updated before the new valve can go in. That’s $450 – $1,100 in added plumbing work.
- Tile versus acrylic surround. Acrylic is fast and clean. Tile is the upgrade most homeowners want once they see it. Porcelain or ceramic tile with a proper cement board and membrane system adds $900 – $2,300 versus acrylic. The waterproofing is the reason the tile work costs more than it looks like it should.
- Glass type and door style. A framed slider is $500 – $800. A frameless hinged door in 3/8-inch glass is $1,200 – $1,800. The difference is engineering and hardware, not just glass thickness.
- Permit and inspection requirements. The City of Hayward usually requires a plumbing permit for a tub-to-shower conversion because the drain line and shower pan change. A permit and inspection adds $150 – $450, but it protects your resale and your insurance. Skipping it is a real risk, and we recommend against it every time.
One more Hayward-specific factor: the East Bay’s clay-heavy soil and seasonal moisture swings mean older slab foundations shift slightly. That shows up as an out-of-level shower pan. It’s fixable with a self-leveling compound or a mud-set pan, but it has to be identified and quoted before the tile goes down, not after. Our technicians have up to 19 years of experience reading these conditions, and we build that reading into the quote.

How to Save on Tub-to-Shower Conversion
There are real ways to keep a Hayward conversion near the bottom of the range without cutting the waterproofing or the plumbing work that protects your home. Here’s what actually moves the number down:
- Keep the existing footprint. If your tub is a standard 60-inch alcove, keeping that footprint avoids moving the drain and supply lines. Moving plumbing to relocate a shower is the largest avoidable cost on the job.
- Choose porcelain tile over stone. Porcelain looks close to natural stone and installs for a fraction of the material cost. The tile itself is $200 – $600 cheaper; the labor is similar. The savings show up in the final invoice, not in the showroom drama.
- Framed glass instead of frameless. A framed slider performs well and costs $500 – $800 versus $1,200 – $1,800 for frameless. If the bathroom is small, the savings here are worth considering.
- Reuse the tub valve if it’s in good shape. If the existing valve is a modern pressure-balance unit in good condition, it can sometimes be reused with new trim. That saves $450 – $1,100 in plumbing work. We check the valve body before recommending replacement, not after.
- Do the demo yourself? No. We don’t recommend homeowner demo here. Tile and tub removal is the most injury-prone part of the job, and cutting into a wall around older plumbing is how a small project becomes an expensive one. The $350 – $900 saved on demo is never worth what follows.
The most reliable saving, though, is an honest quote up front and no surprise change orders. Our written price before any work starts is the whole point – under Clause 1 of the Haven Standard, you get a flat number and a written scope before the truck leaves the yard. No “we found something” surprises on the invoice. And a free second opinion on any written estimate you’ve already got means you can compare line by line before you commit. Call us at (866) 863-1729 and we’ll review a competitor’s quote at no charge.
FAQs – Tub-to-Shower Conversion Cost
Is a tub-to-shower conversion cheaper than a full bathroom remodel in Hayward?
Yes. A tub-to-shower conversion in Hayward costs $3,500 – $10,000, while a full bathroom remodel runs $9,000 – $28,000. A conversion keeps the room’s layout, lighting, vanity, and toilet exactly where they are and focuses spending on the shower itself. That’s why the conversion is the right call when the bathroom works but the tub doesn’t. Call (866) 863-1729 for a written comparison of both options on your specific bathroom.
What does a tiled walk-in shower cost versus an acrylic one in Hayward?
A tiled walk-in shower in Hayward typically costs $6,200 – $10,000, while an acrylic surround conversion costs $3,500 – $5,200. The difference is the waterproofing system, the substrate, the tile-setting labor, and typically the glass. Tiled showers hold up longer in a wet climate and hold resale value better. Both are in range for a standard Hayward alcove; the choice is about longevity and look. Call (866) 863-1729 for an exact quote on either option.
Do I need a permit for a tub-to-shower conversion in Hayward?
Usually, yes. Most tub-to-shower conversions require a plumbing permit from the City of Hayward because the shower pan and drain line change. The permit and inspection add $150 – $450 to the job. Skipping the permit saves that amount up front but can complicate resale, insurance claims, and future inspections. We pull the permit as part of the written scope. Call (866) 863-1729 and we’ll confirm what your specific project needs.
How long does a tub-to-shower conversion take in Hayward?
A standard acrylic conversion takes 3 – 5 working days. A tiled custom shower with a frameless glass door takes 6 – 10 working days due to the extra waterproofing cure time, tile setting, and glass templating. Hidden water damage or a valve replacement can add 1 – 2 days. The written schedule we give you up front includes those scenarios, so you know the timing before the work starts. Call (866) 863-1729 to schedule a measurement.
Can I get a written price before any work starts?
Yes – every Rowan Construction Group job includes a flat written price and written scope before any work begins. That’s not a courtesy; it’s Clause 1 of the Haven Standard. Once the price is agreed, no work proceeds on a change until a signed change order is in place. Your project finishes within a few percent of the number you agreed to, and if anything isn’t done right, the 365-Day Done Right Promise means we make it right. Call (866) 863-1729 for your written estimate.
What Else to Know Before You Book
A few things that show up on almost every Hayward conversion and are worth having in the back of your mind:
- Ventilation matters more than you think. East Bay summers are dry, but winter humidity in Hayward sits high for months. A properly sized exhaust fan (not the builder-grade unit that’s been in the ceiling since 1972) costs $200 – $450 installed and keeps the new shower and paint in good shape. It’s worth adding while the ceiling is open.
- Toilet and vanity stay put in a conversion. If you’re considering moving those too, that’s a full bathroom remodel, not a conversion. We’re happy to price either one, but know which project you’re actually buying before the estimate.
- Documentation comes standard. Every visit includes a photo record of what we found and what we did. You get the before-and-after shots and the in-between shots of the waterproofing, which matter when you go to sell. That’s not an upgrade. It’s how we work.
- Your crew is background-checked and uniformed. Every technician who sets foot in your home has been verified before arrival. No exceptions.
- Live person on the phone, 24/7. Estimates are free and there’s no call center. You reach a person who can answer questions about your specific bathroom.
The right question isn’t “what’s the cheapest conversion in Hayward.” It’s “what’s the price, in writing, for the conversion that won’t fail in five years because someone skipped the waterproofing.” That’s a number we’re happy to put on paper before you commit to anything.
Pricing reflects the Hayward market as of 2026. Rowan Construction Group Hayward offers free estimates – call (866) 863-1729.
What Our Customers Say
"Final invoice was within two percent of the contract. Every change was priced and signed before anyone picked up a tool."
- Malcolm T."Good communication throughout. Weekly written update meant I never had to chase them."
- Nadine G."Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."
- Reggie O.












